Chicago Data Center Campus ORD1


350 East Cermak Road,
7th Floor, Chicago, IL 60616
1-855-699-8372

Located in the heart of the Chicago Financial District on the 7th floor of an 8-story building on a fiber-linked campus.
The building was originally constructed for R.R. Donnelley & Sons Printing in 1912, and the Sears Catalog was printed here until 1993. While it was renovated for data center usage in 1999, the building is historically landmarked and protected.
Just 9 minutes from downtown Chicago, 25 minutes from Midway International Airport (MDW) and 30 minutes from O’Hare International Airport (ORD).

Scalable Capacity

85,729 sq/ft of raised floor space gives you room to grow your business, with options from single racks to full cages.

Digital Exchange

Click-to-provision access to Enterprise Bare Metal, networks, cloud on-ramps, and technology providers.

Rich Connectivity

Access to 19 unique network service providers, cloud on-ramps, and a growing community of service providers.

Energy Efficiency

Energy Star Certified for efficient and sustainable energy usage.

ORD1 Technical Specifications

Buildings

  • Multi-story mixed use building
  • Building interior 183,419 sq/ft
  • Raised floor 85,729 sq/ft

Security

  • 24x7 video surveillance
  • 90-day video storage
  • Two-factor authentication required to access
  • Biometric scanners and badge readers
  • Entrance mantraps
  • Ballistic paneling in lobby
  • Ballistic glass

Connectivity

  • Copper and fiber optic cross connects
  • Dual diverse fiber entrance facilities
  • Carrier neutral interconnection area
  • Roof rights for antenna placement

Fire Detection and Suppression Summary

  • VESDA provides early warning detection
  • Pre-action dry pipe sprinkler system

Reliability

  • 100% Uptime SLA

Support Services

  • Remote Hands (formerly Gold Support)
  • Structured Cabling
  • Secure on-site spare and tool storage

Certifications and Compliance

  • SSAE 18/ ISAE 3402 SOC 1 Type 2
  • SSAE 18/ ISAE 3000 SOC 2 Type 2
  • ISO 27001
  • PCI DSS 3.2.1
  • NIST 800-53 PE

Sustainability and Efficiency

  • Wireless sensors
  • Smart Lighting

Amenities

  • Free secure Wi-Fi
  • Break room
  • Food and beverage vending machines
  • Crash carts
  • Work kiosks
  • Conference room

ORD1 Provider List

Quickly and easily find and connect with service providers and potential business partners.

For a full list of providers, please visit our Marketplace.

ORD1 Get the Spec Sheet

Download

Want to deploy your workloads and applications today?

We offer customized infrastructure solutions, ready to be provisioned and available on demand.

Get started nowContact us

ORD1 Campus Pod Details

ORD1-A

350 East Cermak Road,
7th Floor, Chicago, IL 60616
Request a Quote

Power and Capacity

Utility Power
8.5 MW
UPS Capacity
4.5 MW
UPS Configuration
N+1
Generator Capacity
20 MW
Generator Configuration
N+1
Fuel Capacity
25,000 Gal.
Cooling Configuration
N+1
Cooling Capacity
1,950 Tons

ORD1-B

350 East Cermak Road,
4th Floor, Chicago, IL 60616
Request a Quote

Power and Capacity

Utility Power
3.4 MW*
UPS Capacity
1.62 MW*
UPS Configuration
2N
Generator Capacity
24 MW*
Generator Configuration
N+1
Fuel Capacity
25,000 Gal.*
Cooling Configuration
N+1
Cooling Capacity
2,100 Tons*

* Shared across ORD1-B, ORD1-C, and ORD1-D pods

ORD1-C

350 East Cermak Road,
8th Floor, Chicago, IL 60616
Request a Quote

Power and Capacity

Utility Power
3.4 MW*
UPS Capacity
1.62 MW*
UPS Configuration
2N
Generator Capacity
24 MW*
Generator Configuration
N+1
Fuel Capacity
25,000 Gal.*
Cooling Configuration
N+1
Cooling Capacity
2,100 Tons*

* shared across ORD1-B, ORD1-C, and ORD1-D pods

ORD1-D

350 East Cermak Road,
8th Floor, Chicago, IL 60616
Request a Quote

Power and Capacity

Utility Power
3.4 MW*
UPS Capacity
1.62 MW*
UPS Configuration
2N
Generator Capacity
24 MW*
Generator Configuration
N+1
Fuel Capacity
25,000 Gal.*
Cooling Configuration
N+1
Cooling Capacity
2,100 Tons*

* Shared across ORD1-B, ORD1-C, and ORD1-D pods

Ask us some
questions

Our team is on standby to get you quick answers. Follow the link below and let's get started.

Let's Talk

Request a Quote

Let us know the data center market(s) of interest to you, number of racks or other specifications, and we'll set up a call to go in-depth to make sure you have the pricing you need.

Request a Quote

Schedule a Tour

Live stream a site tour in real time, and see how a secure, reliable facility can help protect whatever you connect.

Schedule a Tour

Last Updated: April 02, 2024